Fast and safe roads need to be in accordance with the region growth

  • Include:

    Consulting, Project Management

  • Area:

    Roads-Highways

  • Cost:

    € 49 719 711,87

  • Status:

    Completed 2007-2009

Project management’s role

Project management’s role had been to control the conversion work execution on the CV-10 Highway section between La Pobla Tornesa and the intersection with the CV-152 providing access to Benlloch, this section has a total length of
9.990 meters

CV-10 Highway

The section type of the Highway is formed by two separated 7.00 m wide double lanes with outer and inner edges of
respectively 2.50 m and 1.50 m, and 0.75 m roadside.
The Central Reservation is large, with a width of 12.00 m from edge to edge.
 

Measurements of the highway

The execution of works from the section II, which crosses the CV-148, Oropesa-Cabanes, allows an easier exit from La
Pobla Tornesa to the coast. After this connection, the road continues to Cabanes using the current road
At the junction of the CV-10 with the CV-148 the liaison III is executed. This link has a roundabout on each side of the
main section. Located in the south of Cabanes, it also allows access to the industrial hub and connect the Alba and
Oropesa Valleys via the CV-148, in each of his senses.
The work ends with the access connection IV to Northern Cabanes, with various radius roundabouts on each side and
an overpass on the main section.

Highway

From there, the highway is located to the right side of the current route, only the current road’s emergency lane is used.
Therefore, in this final part of around 3,000 m , the two channels are completely new.
The final section, the connection V, is present in the vicinity of the current intersection with the CV-152. It is an unique
roundabout with 57 m inside diameter.
This last section provides access to Benlloch and future connection with the access roads to the Vilanova d'Alcolea
airport and the new CV-13 in construction, planned with double lanes.
 