D12 - Studies and Designs of Paving and Improvement of the Uribia Highway— Nazareth, department of La Guajira (Colombia)

Uribia - Nazareth, Colombia

  • Markets:

    URBAN PLANNING , ROADS, HIGHWAYS, BRIDGES AND TUNNELS ,

  • Services:

    ENGINEERING STUDIES ENVIRONMENTAL SERVICES PROGRAM, ADVISORY & PROJECT MANAGEMENT

  • Client:

    Instituto Nacional de Vías (INVIAS). Republica de Colombia.

Roads are the prime connectors between people, in this case between Uribia and Nazareth.

  • Include:

    Studies, consulting, Design

  • Area:

    Roads - Highways

  • Cost:

    237 014 181,35 € (594 876 798 926,00 $COP)

  • Status:

    Completed 2015 - 2018

Improvement and Paving in Phase II

The road corridor object of the Studies and Designs for the Improvement and Paving in Phase II is located in the northernmost area of Colombia and the Department of La Guajira and is part of the so-called Via Circunvalar de la Guajira.

The road is 150,334 Km long

The corridor has a length of 150,334 km. And it has three intersections: Slope Intersection in San Martín, Level Intersection in Nuevo Ambiente and Level Intersection in Puerto Estrella.

The works executed were distributed into the following tasks

• Transportation Study.

• Final layout with detailed topography.

• Geology and Geomorphology for detailed engineering.

• Study of stability and stabilization of slopes, waste disposal areas and sources of materials.

• Study of hydrology and hydraulics.

• Design of structures.• Pavement design.
• Management of shared territories with a differential approach.

• Environmental and social management of the project.

• Estimation of costs and budgets.

• Socio-economic evaluation of the project

• Final executive report

We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies.